First to arrive is the M-BARRIC, leading
a string of tankers up the hill. |
 |
 |
Following on the blocks of the manifest, a light engine
move, led by BNSF C44-9W 1047, creeps up on the Glen Frazer curve. |
It takes a while for the M-BARRIC to
clear the block, but the cantilever signal finally winks green. |
 |